Financial Industry IP Cabling Project

cabling project

FACTS:

Customer: Financial Industry
Number of Sites: 5,300
Number of Site Visits: 10,600
Timeline: 18 months

SCOPE OF WORK:

• Provide Labor and materials to support 5,300 sites for a Nationwide CAT6 cabling project
• Complete up to 33 site visits per night up to 150 per week
• Install, Terminate and Test new CAT6 cable to an avg of 15 IP security camera locations at each site
• Install up to (2) 24 port patch panels in the network equipment rack
• Provide detailed documentation of each site visit including pictures, description of cable pathways and document any out of scope items that may need a return visit.

By the Numbers

5,300 Site Surveys
10,600 patch panels installed
79,500 CAT6 cable drops
Approximately 2,150 miles of cable run